GRIDRUSH — the plan in 3D8 substations · 40 candidate sites · 32 energized · bar height = MW · colour = availability tier
net value vs best
—
MW at month 12
—
sellable MW·months
—
sites energized
—
Real example · CAISO, 21 August 2025
Peak 43,860 MW at 20:00 — after sunset
At 18:00, on the way into the peak, the naive "sign everything non-firm" plan
must shed 28.4 MW of compute. GRIDRUSH sheds 1.0 MW. At the 20:00 peak itself:
18.2 vs 0.0 MW.
That is the whole product: the same 40 sites, the same grid, a plan that is
4.3× more valuable and still keeps every site inside its SLA.