REALPG&E GRIP substations (CAL)
8 real substations · 1,620 MW rating · 1,081 MW 2026 load
1.22×
net value vs best honest plan — the same agent on real utility data
397.7MW at month 12
11,533sellable MW·months
40of 40 sites energized
0.0MWh grid violations
Real: substation identity, coordinates, facility rating and 2026 loading
(PG&E GRIP Data Portal, public). The premium collapses to 1.22× because at the
substation aggregate level these substations are large and not the bottleneck — which is exactly
where PG&E's own Grid Needs Assessment points: in a sample of 2,000 circuits,
124 are already short for 2026 (up to 12.4 MW).
The constraint is per-circuit, not per-substation — that is the next data we need.